Securing the underpass height at the Vltava River waterway – navigation canal Vraňany-Hořín
Securing the underpass height at the Vltava River waterway – navigation canal Vraňany-Hořín
Securing the underpass height at the Vltava River waterway – navigation canal Vraňany-Hořín
Securing the underpass height at the Vltava River waterway – navigation canal Vraňany-Hořín
Pond construction and sailing, PPO
Urban engineering, Project management
2018
Libochovka, river km 2,500 – 8,200 – Study of sediment regime in the river basin
Libochovka, river km 2,500 – 8,200 – Study of sediment regime in the river basin
Libochovka, river km 2,500 – 8,200 – Study of sediment regime in the river basin
Libochovka, river km 2,500 – 8,200 – Study of sediment regime in the river basin
Environmental projects
Dredging construction, Project management
2017 - 2018
Implementation documentation for the drainage of the object Aalto Cibulka / Apartment house Aalto Cibulka – design of drainage of the construction pit
Implementation documentation for the drainage of the object Aalto Cibulka / Apartment house Aalto Cibulka – design of drainage of the construction pit
Implementation documentation for the drainage of the object Aalto Cibulka / Apartment house Aalto Cibulka – design of drainage of the construction pit
Implementation documentation for the drainage of the object Aalto Cibulka / Apartment house Aalto Cibulka – design of drainage of the construction pit
Urban engineering
Project management
2017 - 2018
Feasibility study of a retention reservoir in Lety u Dobřichovic in a locality known as „Waterworks“
Feasibility study of a retention reservoir in Lety u Dobřichovic in a locality known as „Waterworks“
Feasibility study of a retention reservoir in Lety u Dobřichovic in a locality known as „Waterworks“
Feasibility study of a retention reservoir in Lety u Dobřichovic in a locality known as „Waterworks“
Environmental projects, PPO
Dredging construction, Project management
2017
Design and surveying works in the forestal complex owned by the Hostomice municipality with the purpose of creating a set of preventive measures to mitigate the risk of flood and drought
Design and surveying works in the forestal complex owned by the Hostomice municipality with the purpose of creating a set of preventive measures to mitigate the risk of flood and drought
Design and surveying works in the forestal complex owned by the Hostomice municipality with the purpose of creating a set of preventive measures to mitigate the risk of flood and drought
Design and surveying works in the forestal complex owned by the Hostomice municipality with the purpose of creating a set of preventive measures to mitigate the risk of flood and drought
Environmental projects
PPO, Project management
2017 - 2018
Qairokkum Hydropower Rehabilitation Project: Basic Engineering and Design Services, Tajikistan
Qairokkum Hydropower Rehabilitation Project: Basic Engineering and Design Services, Tajikistan
Qairokkum Hydropower Rehabilitation Project: Basic Engineering and Design Services, Tajikistan
Qairokkum Hydropower Rehabilitation Project: Basic Engineering and Design Services, Tajikistan
Hydroenergetics, Dredging construction
Urban engineering
2016
Construction nr. 6963 „Complete reconstruction and enlargement of the Prague WWTP on Emperor Island“, phase 0008 – compensation measures, final closure of the upper navigation canal Troja"
Construction nr. 6963 „Complete reconstruction and enlargement of the Prague WWTP on Emperor Island“, phase 0008 – compensation measures, final closure of the upper navigation canal Troja"
Construction nr. 6963 „Complete reconstruction and enlargement of the Prague WWTP on Emperor Island“, phase 0008 – compensation measures, final closure of the upper navigation canal Troja"
Construction nr. 6963 „Complete reconstruction and enlargement of the Prague WWTP on Emperor Island“, phase 0008 – compensation measures, final closure of the upper navigation canal Troja"
Pond construction and sailing, PPO
Project management
2015 - 2016
Feasibility study, option to elaborate project documentation and documentation for the construction of a HPP Sebzor on the Shokhdara River
Feasibility study, option to elaborate project documentation and documentation for the construction of a HPP Sebzor on the Shokhdara River
Feasibility study, option to elaborate project documentation and documentation for the construction of a HPP Sebzor on the Shokhdara River
Feasibility study, option to elaborate project documentation and documentation for the construction of a HPP Sebzor on the Shokhdara River
Hydroenergetics, Pond construction and sailing
Environmental projects, Project management
2015 - 2016
SHPP Scotland, location Chesthill
SHPP Scotland, location Chesthill
SHPP Scotland, location Chesthill
SHPP Scotland, location Chesthill
Hydroenergetics
Project management
2015 - 2016
Amerika dam, Feasibility study
Amerika dam, Feasibility study
Amerika dam, Feasibility study
Amerika dam, Feasibility study
Dredging construction, Environmental projects
PPO, PR and grant support
2015 - 2016
Flood protection of the CASTS object
Flood protection of the CASTS object
Flood protection of the CASTS object
Flood protection of the CASTS object
PPO
Project management
2014 - 2015
Nivnička, Bystřice pod Lopeníkem km 14,4-17,9, flood damage rehabilitation
Nivnička, Bystřice pod Lopeníkem km 14,4-17,9, flood damage rehabilitation
Nivnička, Bystřice pod Lopeníkem km 14,4-17,9, flood damage rehabilitation
Nivnička, Bystřice pod Lopeníkem km 14,4-17,9, flood damage rehabilitation
Environmental projects
Dredging construction, Project management
2013 - 2015